A website launch feels like the end of a project. In practice it is the start of the site's real life: real visitors, real enquiries, real content updates. Our data shows how quickly that life begins.
Of the 62 WordPress projects where we could see a clear go-live date, 34% had new requests from the client after launch. Among those, the first request came after a median of 12 days. A quarter came within 2 days, and three quarters within 32 days.
So if you launch on a Monday, there is a good chance you will want something changed within two weeks. That is normal – and it is worth planning for.
Launch day itself
Moving a finished site from our staging environment to the client's domain is usually quick. The go-live task in our WordPress projects took a median of 1 day. What takes time is not the move, but what surrounds it:
- DNS changes that need time to spread
- Email hosting that must keep working while the domain points to a new server
- SSL certificates being issued
- Licences for premium plugins being activated on the live domain
- Caches being cleared everywhere
We plan launches early in the week, never on a Friday afternoon, so any issue can be fixed while everyone is available.
The first two weeks: what clients ask for
Based on the post-launch tasks in our projects, the first requests fall into a few groups:
Small content changes
A phone number formatted differently, a team member added, a service description rewritten after the owner read it on the live site. Seeing the site on its real domain often triggers a final read-through.
Things noticed by others
Friends, customers and colleagues look at the new site and give feedback. Often it is about mobile display or a spelling mistake on a page nobody checked closely.
Form and email checks
"Did the enquiry arrive?" Contact forms that send notifications to the right address, confirmation emails and thank-you pages get tested with real submissions. If notifications land in spam or go to an old address, it shows up now.
Tracking and marketing
Once the site is live, clients want Google Analytics, Search Console, Meta Pixel or Google Ads conversion tracking connected – often because an ad campaign is about to start.
Search engines
Clients search for their company and still see the old title or description in Google. This is normal: Google needs time to recrawl the site. We submit the sitemap in Search Console to speed things up.
Weeks three to eight: the site starts to grow
After the first adjustments, requests shift to growth: a new landing page for a campaign, a blog section, a new language, an extra service page. These are no longer corrections but new work, and we plan them as small projects or as part of a maintenance plan.
What our maintenance clients request later
Across 18 maintenance retainers with 209 recorded requests, the mix over time looks like this:
| Request type | Share of requests |
|---|---|
| Bug fixes | 21% |
| Marketing and campaign assets | 16% |
| Content and design changes | 13% |
| Integrations and syncs | 11% |
| Email, forms and notifications | 9% |
| Outages and security | 5% |
| Tracking and analytics | 5% |
| Hosting and migrations | 4% |
The median request took 1.2 of work. Most post-launch work is small, but it adds up.
How to prepare for life after launch
- [ ] Decide who on your team is responsible for website content
- [ ] Ask for a short tutorial or screen recording on how to edit texts and images
- [ ] Send a test enquiry through every form on launch day
- [ ] Connect Search Console and analytics before any campaign starts
- [ ] Keep a list of small changes and send them together, not one by one
- [ ] Agree who handles updates, backups and security – you, us or your host
Editing the site yourself
Many clients want to change texts themselves after launch. We record short tutorials showing how to edit the most common sections in the page builder. One caution from experience: edits to global elements (header, footer, templates) affect every page. If unsure, ask before changing.
When things break
Websites rarely break on their own. The usual triggers are plugin updates, hosting changes, expired licences or a well-meant edit in the wrong place. A maintenance plan with regular updates, backups and monitoring catches most of these before visitors notice.
FAQ
Are small changes after launch included?
Corrections of anything that does not match the approved design are fixed as part of the project. New content, pages or features after launch are new work, handled as small tasks or through a maintenance plan.
How soon after launch can I start advertising?
As soon as forms and tracking have been tested. We recommend a real test enquiry and a check of conversion tracking before any ad spend.
Do I need a maintenance plan?
Not always. For simple sites with few plugins, occasional updates may be enough. For sites with booking, shops, integrations or regular campaigns, a plan saves time and prevents outages.
Is a redesign faster than a new website?
Not always. Our 17 WordPress redesigns had a median delivery of 36 days versus 31 days for new builds, and slightly more revision rounds, because existing content and old expectations have to be reconciled.
How much does missing content slow a website down?
A lot. Missing or late content appeared in 23 of our WordPress projects, and those had a median delivery of 74 days versus 26 days without it.
Where the numbers come from: our own project records in Odoo – 233 finished projects, 909 tasks and about 4941 logged hours, mostly from 2025–2026. Durations are calendar days from kickoff and we quote medians, so one unusually long project does not distort the picture.
Planning a website project?
If you want a realistic plan for your own project, book a short call with our team and we will walk you through the phases, what we need from you and where projects like yours usually lose time. You can also browse finished work in our website portfolio.
Comments